Lesson 4 – Support Units

Camlok Props:

Mechanical props available on the BML range from 1,6m up to 3,8m in length:

  • MS  1,600m to 2,650m
  • MG  2,100m to 3,300m

Full Column Grouted tendons:

  • Barberton Mines make use of 1.5m long and 2.1m long full column  grouted Shepherd crooks @Yl2mm.
  • 1.5m Shepherd Crook is 1.5m long with a O.5m long overbend loop resulting in an approximate 1.6m effective length tendon.
  • 2.lm Shepherd crooks is 2.0m long with a 0.6m long overbend loop resulting in an approximate 2.lm effective length tendon.

 

Grout Capsule Cement:

  • Grouting capsules are hydrated and installed into the support hole prior to insertion of the steel tendon support unit.

Jackpot- Pre-stressing device (PSU):

  • 20cm Diameter PSU units to pre-load installed stick support to +/-200KN. This to make the installed stick active which assists in reducing blast outs.

Timber elongates (18cm to 20cm Diameter)

Stick support units are delivered at the following lengths:

  • 3.6m long,4.2m long and 5.0m long

Osro Straps

Cable Anchors and Trusses:

  • Cable Anchors are generally installed by the Secondary Support Contractor. The Cable Anchors in use are 4.5m long,6.5m  long and 15.0m long.