Topic 7 – Scaffolding:

SCAFFOLDING

Scaffolding must be:

  • Erected and dismantled under the supervision of a competent person.
  • Secured against working surface of structure and braced to ensure stability.
  • Platform to cover entire work level and fitted with kick board.
  • The wheels of mobile scaffolds must be braked and chocked when stationary.
  • Identified on register, inspected at weekly intervals, before use and after rainy/windy conditions.
  • Safe access to be provided at all times.
  • Scaffold to be declared safe and tagged before use.

Always

  • Keep walkways free of obstacles, tools and equipment.
  • Keep platforms free of grease and mud.
  • Climb from one level to another using the ladders provided.
  • Use a crane, hoist or winch to lift materials up and down from the scaffold.

Never:

  • Exceed the safe working load of the scaffold.
  • Stand on the hand-rails.
  • Work from a defective scaffold.
Skip to toolbar